THE FOUNDER

ROLF HELBERG JR.
Co-founder & CEO

Business developer

Improve the construction industry

  • More sustainable
  • Saving time > 50%
  • Saving money > 20-30%
  • Build any shape, form or style
  • Save energy > 50%
  • Reduce waste < 100%

Improving construction practices radically

  • More sustainable
  • Saving time > 50%
  • Saving money > 20-30%
  • Build any shape, form or style
  • Save energy > 50%
  • Reduce waste < 100%

the SOLUTION - Our Norwegian building system Fleximent™

Large-scale manufacturing

  • >10,000 housing units/year
  • Several factories
  • Train existing building
    companies
  • A complete building
    solution
  • Retrofitting existing buildings
  • Up to 100% reuse of the material
  • Recycle composite waste to new materials

Large-scale manufacturing of a costeffective and innovative building material

Production capacity ~10,000 housing units yearly

BUSINESS MODEL

BUSINESS MODEL

  • Manufacturing large-scale, and
    selling B2B (and B2C)
  • Fully owned manufacturing or
    licensed / franchise partners
  • Recycling facility of glass fiber
    to building materials

TRACTION

REFERENCECUSTOMERS WHO HAVEUTILIZED THE BUILDINGSYSTEM

These customers have built part or all of their buildings with Fleximent materials

THE PRODUCT

  • Designed to be built very quickly, 40 m2/h.
  • Stronger, very durable and long-lasting
  • Water resistant
  • Cheaper, reducing cost by 20-30 %
  • Easier to work with, almost like LEGO
  • Saves energy
  • Better fire protection

RECYCLE WASTE TO NEW MATERIALS

We can recycle the following fiberglass / composite waste to new building materials

  • Dated windmills
  • Recreational vehicles
  • Camping wagons
  • Yatchs and boats
  • Airplane parts

Use Solar film as part of the buildings to create energy

One can bond solar film to both the walls and the roof to generate electricity

Type: CIGS Thin Film Solar Module
Max. Power: 275W
Size: 5745* 494*3.5mm
Working condition: Sunny, Cloudy, or even Rainy days
Special Feature: Good performance in diffuse light or low-lux condition
Designed specially for rooftops
Integrates with roofing surface
No mounting hardware
No roof penetrations No wind load
Low profile

COMPLETED buildings- MORETHAN 200projectsIN NORWAY ALONE

TEAM

ROLF HELBERG JR.
Founder & CEO

Allrounder, business strategy,
sales, marketing

JAN HOLM HANSEN
CTO

Technical officer and glass-
fibre specialist

JAMES FITZGERALD
Chief Editor at the Financial Times in London

Chief Editor at the Financial
Times in London

MARTIN PECAR
Optimization expert in transportation

Optimization expert in transportation

RODRIGO PIMENTEL PESSOA DA COSTA
Architect

Master in Architecture and
Urban Planning

GIUSEPPE TORRISI
Architect

Expert with floating buildings
and cities

TALUKDER JABIR AHMED
Software Engineer

Allround web designer and
programmer

PLAN AND TIME FRAME

Build large-scale manufacturing facilities:
Estimated time frame 12-18 months to set up a full-scale factory
Cooperate with investors, industrial partners etc.
Establish manufacturing facilities, owned/licensed
.Seek Governmental grants for creating jobs and sustainable solutions
Buy or rent plots for the factories at the right locations
Buy and install the machinery
Hire 120-150 employees at each factory and provide training
Secure runway of a year after launch to manufacturing and delivery compare